Categories
Albany CACertain Albany multifamily buildings built before 1981 with 3 or more dwelling units and a wood-frame target story are subject to the City's mandatory soft-story retrofit program. October 15, 2026 is a major compliance date: Tier 1 buildings reach their construction and affidavit deadline, while Tier 2 buildings reach their retrofit permit deadline.
There is another date Albany owners should know right now. The California Residential Mitigation Program is accepting 2026 registrations for its Earthquake Multi-Unit Retrofit grant program through September 30, 2026. Albany is one of the participating cities, although the grant has its own eligibility rules and funding is not guaranteed.
If you own, manage, are buying, or are selling a condo or multifamily property in Albany, this is the kind of property-specific issue I would rather identify early than discover when a transaction is already moving quickly.
IMPORTANT 2026 ALBANY DATES
Two deadlines are especially important right now
Building status, tier assignment, extensions, permit requirements, and grant eligibility are property-specific. Owners should confirm current requirements directly with the City of Albany and CRMP.
Which Albany buildings are subject to the soft-story retrofit program?
Albany adopted its mandatory Wood-Frame Target Story Seismic Retrofit Program in 2023. The City says a building generally needs to meet all three of the following conditions to be subject to the retrofit requirement:
- It was built, permitted, or designed before 1981.
- It contains 3 or more dwelling units.
- It has one or more wood-frame target stories, often shortened to WFTS.
A soft-story condition is commonly associated with a weaker lower level, such as tuck-under parking or large ground-floor openings beneath living space. But Albany's ordinance uses a specific technical definition of a wood-frame target story, so I would not try to decide whether a building is covered simply by looking at it from the street.
The safest approach is to review the City's notices and screening records for the building. In many cases, Albany says an owner needs a licensed architect or engineer to determine whether the building has a wood-frame target story.
If an owner never received a City notice but believes the property may meet the age, unit-count, and structural criteria, the City's program page directs owners to contact the Building Department rather than assume the building is exempt.
What are Albany's soft-story retrofit deadlines?
Once a building is identified as a subject building, Albany assigns it to one of four compliance tiers. The tier depends on the number of dwelling units and whether the target story contains a dwelling unit or certain business, mercantile, or assembly occupancies.
| Tier | General City Description | Retrofit Permit | Construction and Affidavits |
|---|---|---|---|
| Tier 1 | 5+ units, no listed dwelling/business/mercantile/assembly occupancy in target story | Oct. 15, 2025 | Oct. 15, 2026 |
| Tier 2 | 3-4 units, no listed dwelling/business/mercantile/assembly occupancy in target story | Oct. 15, 2026 | Oct. 15, 2027 |
| Tier 3 | 5+ units, at least one listed occupancy in target story | Oct. 15, 2027 | Oct. 15, 2028 |
| Tier 4 | 3-4 units, at least one listed occupancy in target story | Oct. 15, 2028 | Oct. 15, 2029 |
The screening deadline for these tiers was October 15, 2024. If you are looking at a property now, the practical question is not only whether the building falls under the ordinance. It is also: What tier is it in, and what has already been completed?
Why does October 15, 2026 matter?
October 15, 2026 does not mean the same thing for every Albany soft-story building.
For Tier 1, it is the deadline for retrofit construction and required affidavits. For Tier 2, it is the deadline to obtain the retrofit permit, with construction and affidavits due one year later.
Tiers 3 and 4 have later deadlines. That is why a generic statement such as "Albany soft-story retrofits are due in October" can be misleading. The correct deadline depends on the building's City-assigned tier.
The City's screening instructions also indicate that the Building Official has authority to administer the program and may consider limited exemptions or six-month extensions under specified circumstances. Owners should contact the City directly rather than assume an extension applies.
Can Albany property owners get help paying for a retrofit?
Some Albany owners may qualify for the California Residential Mitigation Program's Earthquake Multi-Unit Retrofit, or EMR, grant program.
For the 2026 registration cycle, CRMP lists Albany as a participating city and says registration is open from August 19 through September 30, 2026.
CRMP says qualifying buildings are generally multi-story, wood-framed residential buildings with 5 to 10 units, a soft, weak, or open-front seismic deficiency, and a city retrofit notice or order. Other program rules also apply.
The current program advertises assistance of up to 70% of eligible retrofit costs, capped at $4,260 per unit, plus up to $7,000 for qualifying engineering and permit costs. The maximum possible grant is $49,600 for a qualifying 10-unit building under the program caps.
Registration also does not guarantee funding. CRMP advises owners to confirm eligibility and program timing before relying on reimbursement, especially if permits, engineering work, or physical construction have already started.
What should Albany condo owners and HOAs know?
Condo buildings deserve special attention because the structural requirement applies at the building level, while ownership is divided among individual units.
Albany says only one screening form is required for each condo building. When the City did not have a building manager or HOA contact, it may have sent notices to individual owners, but the owners still need to designate someone to coordinate the building's screening. The City notes that this will often be a building manager or HOA official.
CRMP gives similar guidance for its grant program. A condo retrofit is coordinated for the entire building, so condo owners should work through the HOA or property management company when evaluating grant participation and the retrofit project.
If I were reviewing a condo in a potentially affected Albany building, I would want the current HOA records to answer questions such as:
- Did the building receive a City soft-story notice?
- What compliance tier is the building in?
- Was the screening completed?
- Has the retrofit permit been issued?
- Has an engineer or architect prepared a retrofit plan?
- What is the current project budget?
- Has the HOA discussed reserves, financing, or a special assessment?
- What construction timeline is currently expected?
- If work is complete, what City or project completion documentation is available?
Those are due-diligence questions, not assumptions about what a particular HOA has or has not done.
What should Albany sellers check before listing?
If you are selling a condo or multifamily property that may be in a subject building, I would surface the soft-story status early.
That does not mean trying to give structural or legal advice. It means organizing the information that already exists so the transaction is not forced to solve a building-level question at the last minute.
Depending on the property, useful records may include the City notice, tier assignment, screening result, permit status, engineering plan, HOA communications, meeting minutes, reserve information, project budget, funding plan, and completion documents.
If you are getting ready to sell in Albany, you can also review our East Bay home-selling strategy and our existing Albany homeowner guide, What Albany Homeowners Should Know About WM Service and 2026 Rates.
What should Albany buyers review before purchasing?
Buyers should not assume that an older condo or multifamily property is either subject to the program or fully compliant based on a listing description alone.
If the building may be affected, ask for the building-specific records and compare them with the current City program requirements. For condos, review the HOA documents carefully. For multifamily properties, understand where the building is in the screening, design, permitting, and construction process.
The goal is not to panic over the word "soft-story." The goal is to understand what has already been determined, what still needs to happen, and what costs or timelines may be relevant to your decision.
You can learn more about buying a home with Ask Ponytail or search current East Bay listings.
Does a soft-story retrofit requirement affect property value?
There is no responsible way to say that an Albany soft-story requirement automatically raises or lowers a property's value.
Real estate value depends on the individual property, comparable sales, condition, location, income potential, HOA finances, buyer demand, interest rates, insurance, and many other factors.
What the retrofit program can affect is the information a buyer or seller may need to understand. A completed project, a pending permit, an HOA funding plan, or an unresolved building obligation can create very different due-diligence questions.
That is where local expertise matters. The useful question is not, "Do soft-story buildings sell for less?" The better question is, "What is the actual status of this building, and how should that information fit into this specific real estate decision?"
What should Albany property owners do next?
If you own a potentially affected property, start with the building's City records and current program status. Confirm the tier, permit requirements, completion requirements, and any applicable deadline directly with the City of Albany.
If your building has 5 to 10 units and may qualify for the current CRMP grant cycle, review the EMR eligibility rules before the September 30, 2026 registration deadline. Registration does not guarantee funding, so treat the grant as a program to investigate, not money to assume is already available.
If your question is about buying or selling the real estate rather than engineering the retrofit, that is where I can help you organize the property information, understand the transaction context, and identify the questions that should be answered before you move forward.
ALBANY • EAST BAY • LOCAL REAL ESTATE
Buying or Selling an Albany Property?
Albany real estate can come with property-specific questions that do not show up in a generic market report. If you are evaluating a condo, multifamily building, or home in Albany, Sara Min Zhao and the Ask Ponytail team can help you organize the real estate side of the decision and identify the local issues worth investigating early.
No pressure. No obligation. For engineering, code, grant, HOA, or legal determinations, verify directly with the City, CRMP, your HOA or property manager, and the appropriate qualified professionals.
Frequently Asked Questions About Albany Soft-Story Retrofits
Which Albany buildings are subject to the soft-story retrofit program?
The City of Albany says a building must generally meet three criteria: it was built, permitted, or designed before 1981; it contains 3 or more dwelling units; and it has one or more wood-frame target stories. Building-specific status should be confirmed with the City and, when needed, a qualified design professional.
What is the October 15, 2026 Albany soft-story deadline?
October 15, 2026 is the construction and affidavit deadline for Tier 1 buildings and the retrofit permit deadline for Tier 2 buildings. Tiers 3 and 4 have later permit and construction deadlines.
How do I know which Albany soft-story tier my building is in?
Albany assigns compliance tiers based on the number of dwelling units and whether the target story contains a dwelling unit or certain other occupancies. Owners should use their City screening and program records or contact the Albany Building Department rather than guessing from the exterior of the building.
Can Albany property owners get a grant for a soft-story retrofit?
Possibly. Albany is an eligible city for CRMP's Earthquake Multi-Unit Retrofit program. For the 2026 cycle, registration runs August 19 through September 30, and qualifying 5-10 unit buildings may be eligible for grant funding subject to program rules and funding availability. Registration does not guarantee an award.
What should Albany condo owners ask their HOA about soft-story compliance?
Ask for the City notice and tier, screening status, permit status, engineering or retrofit plan, project timeline, budget or assessment information, and completion records when applicable. The City says only one screening form is needed per condo building, so coordination typically happens through the HOA or building manager.
Should an Albany buyer check soft-story status before buying a condo or multifamily property?
Yes, if the property may be in a subject building. Retrofit status, permits, HOA planning, project costs, and completion records can be important due-diligence items. Buyers should verify the building-specific facts with the City, HOA or property manager, and qualified professionals.
About Sara Min Zhao
Sara Min Zhao, REALTOR®, DRE #01449007, is the founder and Chief Listing Strategist of Ask Ponytail. Sara helps East Bay homeowners, buyers, and sellers understand the property, the local market, and the neighborhood-specific details that can shape a real estate decision.
